Danish Aziz Awan

Cowlar Design Studio and Placentek

Three offices from bare concrete to working

Electrical, power backup, plumbing, internet, furniture and every machine, run off one checklist.

Sector
Operations
Where
Islamabad
When
2021 to 2025
Work
Operations

The problem

A grey structure is walls and a roof. A company needs power that does not drop, internet that does not stop, and a desk ready for every new hire.

What we delivered

  • Two offices for Cowlar, a Y Combinator company, including F-7 Markaz, and one for Placentek.
  • Electrical wiring and power backup, much of it done by hand. I am an electrical engineer and I own the tools.
  • Plumbing, woodwork and metal work, furniture, workstations, PCs, laptops and routers.
  • One checklist that took each office from empty to working.

Results

  • 3offices built

My role

I ran each build myself, from planning to the last cable.

Next: An internal people platform, built by the recruiter

Have something that needs building?

A team to hire, a back office to set up, a hiring system, a tool or a website that has to work. Book a free 20 minute strategy call and I will tell you honestly whether I am the right person and what it would take. Looking for career advice? Paid career sessions start at PKR 3,000.

Monday to Saturday, 11am to 1pm Pakistan time, on Google Meet.